SpaceX Starship page

Portions of this thread copied from a Starship Dev thread on r/SpaceX.

FAQ

  1. When next launch? (IFT-5) Booster catch is now NET October 13th, per SpaceX: Tweet, website, archive
  2. When previous launch? (IFT-4)? Booster 11 and Ship 29 launched on 2024-06-06.
  3. What was the result? Both booster and ship make it to landing burn and splashdown. Ship flaps took a beating on reentry, but remained in control of the vehicle.

Quick Links

Nerdle Cam | Lab Cam | Sapphire Cam | Sentinel Cam | Rover Cam | Rover 2.0 Cam | Rocket Ranch Cam | Plex Cam | NSF Starbase Live

Starship Dev 57 | Starship Dev 56 | IFT-4 launch thread | Starship Dev 55 | IFT-3 launch thread | Starship Dev 54 | Starship Dev 53 |

Official SpaceX Starship Update Video (2024-04-06)


Road closures

Cameron County website - @bocaroad Mastodon bot

*As of 2024-10-31

  • 2-hour road delays posted for Oct 2nd and 3rd between 00:00 and 03:00 for transport from factory to Massey’s.
  • Road closures for “non-flight testing” are posted for Oct 7th (10:00 to 22:00), and for Oct 8th and 9th (08:00 to 20:00).
  • 1-hour road delays are posted for Oct 6th and 7th between 00:00 and 03:00 for transport from Brownsville Port to Massey’s.
  • Oct 7th road closure (10:00 to 22:00) is scheduled.
  • Road closures for “flight testing” are posted for Oct 13th, 14th, and 15th, from 00:00 to 14:00. (And in the alternative, Sep 24th or 25th, likely erroneous)
  • Oct 13th 00:00 to 14:00 road closure is scheduled.
  • Road closure is amended to include the period from Oct 13th 14:00 to Oct 14th 14:00. (ViX 1, ViX 2)
  • 2-hour road delays are posted for Oct 15th (12:00 to 15:00) and 16th (00:00 and 03:00) for transport from pad to factory.
  • Pad A: Booster transport stand finally arrives at the pad after an apparent delay the previous day. (ViX, NSF, Fediverse Starbase Tracker)
  • 1-hour road delays are posted for Oct 21st (12:00 to 15:00) and 22nd (00:00 and 03:00) for transport from factory to pad. These are currently crossed out on the main page, so it possible that these have been cancelled.
  • 1-hour road delays are posted for Oct 22nd (12:00 to 15:00) and 23rd (00:00 and 03:00) for transport from factory to pad.
  • Road closure is posted for Oct 23rd (18:00 to 00:00) for non-flight testing activities.
  • Road closures are posted for Oct 24th and 25th (08:00 to 20:00) for non-flight testing activities. Oct 24th closure is scheduled.
  • Oct 24th road closure is extended from 20:00 to 23:00.
  • 1-hour road delays are posted for Oct 25th (22:00 to 00:00) and 26th (12:00 and 15:00) for transport from pad to factory.
  • 2-hour road delays are posted for Oct 26th (00:30 to 03:30) and 27th (00:00 and 03:00) for transport from factory to Massey’s.
  • Oct 25th road closure is revoked.
  • 2-hour road delays are posted for Nov 1st (01:00 to 04:00) and 2nd (00:00 and 03:00) for transport from Massey’s to factory. (Presumably S33 rollback)

Vehicle Status

*As of 2024-10-31

Follow Ring Watchers on Twitter and Discord for more.

Ship Location Status Comment
S20 Rocket Garden Pending scrapping?
S26 Rocket Garden Pending scrapping? Static fire Oct. 20. No fins or heat shield, multiple mysterious changes. Completed 3 cryo tests, latest on Oct 10. Rolls to Massey’s May 8th, cryo test May 24th, static fired Jun 3rd, rolls to rocket garden Jun 12th. Moves to Megabay 2 Aug 13th, raptors removed Aug 14th.
S30 Indian Ocean Successful splashdown 2x cryo: Jan 3rd and Jan 5th. Engines installed ~Apr 9th. Static fired May 8th. Heatshield replacement completed by Jul 20. Static fired Jul 26th. Raptor replacement Aug 3rd. Spin prime Aug 6th. Full stack cryo tests Sep 23rd and Oct 7th. FTS installed Oct 9th. Launched Oct 13th, with on-target splashdown in Indian Ocean.
S31 Highbay Resting Cryo tested May 12th, suffers small electrical fire. Underwent repairs in the Highbay, rolls back to Massey’s Jul 1. Cryo tested Jul 2nd and 3rd. Engines installed by Jul 26th. Rolls to Massey’s Sep 6th. Partial (aborted) cryo test Sep 8th. Static fired Sep 18th.
S32 Rocket Garden Pending scrapping? Fully stacked, fore flaps installed but not aft flaps
S33 Massey’s Pending engine install First V2 Starship. Nosecone spotted Jul 14th. Forward section spotted Jul 27th. Stacking completed Aug 23. Cryo tested Oct 29th (partial), 30th (full), and 31st (full).
S34 Starfactory Stacking Methane header tank spotted Aug 14th. Nosecone stacked on payload bay Sep 20th.
S35 Starfactory Parts spotted Parts spotted Sep 20th.
Booster Location Status Comment
B12 Megabay 1 Post-flight inspection Cryo x2, Static fire Jul 15th. Full stack cryo tests Sep 23rd and Oct 7th. FTS installed Oct 9th. Launched Oct 13, returned to launch site for successful chopstick catch. Moved to Megabay 1 Oct 15th.
B13 Megabay 2 Resting Cryo tests Apr 26th (methane tank) and Apr 29th (LOX tank). Static fired Oct 24th.
B14 Megabay 1 Cryo testing Stacked Apr 26th, Cryo tested Oct 4th and 5th.
B14.1 Sanchez Resting Multiple catch simulation “slap tests” performed on Jun 26th and 27th.
B15 Build Site Assembly Potential aft end, common dome section, aft tank section, and forward dome spotted.
B16 Build Site Assembly Parts spotted
B17 Build Site Assembly Parts spotted

Resources

  • Ludu@sh.itjust.works
    link
    fedilink
    English
    arrow-up
    4
    ·
    24 days ago

    Really looking forward to tomorrow! I’ll set my expectations low and think that they won’t attempt a catch, so that I can be pleasantly surprised if it happens. Also, I hope the work on the ship’s TPS will be enough to avoid any burn-through this time!