Warning: Some posts on this platform may contain adult material intended for mature audiences only. Viewer discretion is advised. By clicking ‘Continue’, you confirm that you are 18 years or older and consent to viewing explicit content.
You know, we’re not required to do that but because of you I just ordered some locks and labels for the field kit (edit: as well as breaker locks).
Our stuff is always temp (8-12mo) and on a dedicated line. The sites we’re on always involve coordinating with the clients appropriate people and specifically stating we’re not trained in this to their standards (which is why I know some of this stuff but not to the letter), but an extra layer is always a good idea. No harm ever came from an extra lock that couldn’t be fixed.
Thanks.
edit: for the record it’s not like we’re negligent, everything in our system is designed to fail-safe, and we compartmentalize power delivery, but still, no harm in a few extra items in the kit.
You know, we’re not required to do that but because of you I just ordered some locks and labels for the field kit (edit: as well as breaker locks).
Our stuff is always temp (8-12mo) and on a dedicated line. The sites we’re on always involve coordinating with the clients appropriate people and specifically stating we’re not trained in this to their standards (which is why I know some of this stuff but not to the letter), but an extra layer is always a good idea. No harm ever came from an extra lock that couldn’t be fixed.
Thanks.
edit: for the record it’s not like we’re negligent, everything in our system is designed to fail-safe, and we compartmentalize power delivery, but still, no harm in a few extra items in the kit.