Warning: Some posts on this platform may contain adult material intended for mature audiences only. Viewer discretion is advised. By clicking ‘Continue’, you confirm that you are 18 years or older and consent to viewing explicit content.
I would scale a 3 floor building by climbing down balconies before I call maintainence to let me out. Or toss some rope out the window and climb down I guess.
But I think I would even try taking the entire handle off before calling maintenance. Or even straight up texting a family member and waiting a few hours.
My wife, on the other hand, is the “I tried to wiggle it lightly a few times so now I am giving up”. Installed a new light last week, and it takes a split second to actually turn on. In the literal 600-800ms it takes to charge up, she flipped the switch 3 or 4 times, and loudly yelled about how the piece of shit we bought doesn’t work. I simply went over and flipped the switch up and left it there to actually power up.
I would scale a 3 floor building by climbing down balconies before I call maintainence to let me out. Or toss some rope out the window and climb down I guess.
But I think I would even try taking the entire handle off before calling maintenance. Or even straight up texting a family member and waiting a few hours.
My wife, on the other hand, is the “I tried to wiggle it lightly a few times so now I am giving up”. Installed a new light last week, and it takes a split second to actually turn on. In the literal 600-800ms it takes to charge up, she flipped the switch 3 or 4 times, and loudly yelled about how the piece of shit we bought doesn’t work. I simply went over and flipped the switch up and left it there to actually power up.
People like that 100% exist.
tbf I would definitely consider an 800ms delay on a light bulb as that light bulb not working and needing to be replaced
Taking the handle off is exactly what I’d do, no need to scale the side of a building lmao.