Warning: Some posts on this platform may contain adult material intended for mature audiences only. Viewer discretion is advised. By clicking ‘Continue’, you confirm that you are 18 years or older and consent to viewing explicit content.
Environmental assessments, negotiations with First Nations, land acquisition/expropriations, not to mention that every little town along any proposed route would be pushing for a stop. Throw in assorted loons and NIMBYS and their legal efforts, and it’s a wonder anything ever gets built. The fact that there are more people makes it much more difficult, not easier.
The initial transcontinental railways were very much a partnership between business and government. And a hugely corrupt one at that.
The Trans Mountain pipeline just going from Alberta to BC port is running at $30B currently. Much of that is due to opposition from locals and their legal efforts and protests. It’s a hugely easier construction/engineering effort to put in a pipeline than an HSR line. Grades aren’t important, a ditch is dug and the line is plopped in then covered. They’re deep enough and flexible enough that most heaving won’t affect it. Throw in some booster stations and Bob’s-your-uncle.
HSR tracks have to be near perfect to ensure stability and there are tight limits on allowable grades/radius etc. Just the route surveys would be a huge challenge.
Environmental assessments, negotiations with First Nations, land acquisition/expropriations, not to mention that every little town along any proposed route would be pushing for a stop. Throw in assorted loons and NIMBYS and their legal efforts, and it’s a wonder anything ever gets built. The fact that there are more people makes it much more difficult, not easier.
The initial transcontinental railways were very much a partnership between business and government. And a hugely corrupt one at that.
The Trans Mountain pipeline just going from Alberta to BC port is running at $30B currently. Much of that is due to opposition from locals and their legal efforts and protests. It’s a hugely easier construction/engineering effort to put in a pipeline than an HSR line. Grades aren’t important, a ditch is dug and the line is plopped in then covered. They’re deep enough and flexible enough that most heaving won’t affect it. Throw in some booster stations and Bob’s-your-uncle.
HSR tracks have to be near perfect to ensure stability and there are tight limits on allowable grades/radius etc. Just the route surveys would be a huge challenge.